Upon removal of all structures including tanks, piping, racks, bollards, pumps, valves, buildings and other structures, EnviroVantage was to backfill all below grade basements, pits, trenches and voids without removing or damaging slabs, tank foundations bases, and secondary containment walls and dikes.
Full-service planning and execution:
Trinseo Latex Plant
Select Demolition
Gales Ferry, CT
STEEL
LIGHT IRON
% Recycled Materials Landmark
A high-risk demolition in an active chemical processing site requires precision, adaptability, and strategic problem-solving. With hazardous material abatement, universal waste disposal, and demolition of complex infrastructure—including 15 buildings, 3 AST tank farms, a Butadiene sphere, and over two miles of above-ground piping—every step presents logistical and technical hurdles.
Successfully navigating active dock schedules, dismantling under extreme conditions, and protecting essential utilities while preventing sparks during chemical offloading tests the limits of engineering expertise, planning rigor, and operational excellence.
The success of this operation hinged on EnviroVantage’s ability to adapt, innovate, and maintain absolute control over all the moving parts involved in this project.